Shutting down on over voltage

Shutting down on over voltage

PPS are no longer a distributor for the Kohler Marine and Industrial products within Australia and for any Kohler product technical support we can refer customers or our technicians directly to Ty Martin of Clarke Energy: TyMartin| Service/Technical Support – Kohler Clarke EnergyTy.Martin@clarke-energy.com t: +61882902100 m: +61437101729 www.clarke-energy.com genset starts after 3 seconds appears to load the engine and genset shuts down on OU (over voltage) flasher relay faulty on RIB change RIB
    • Related Articles

    • PLD VOLTAGE INCORRECT - error codes

      If an OM engine is ordered as the incorrect operational voltage to original spec (ie. running at 12v but PLD looking for 24v) itcan create an error code. The only way this can be addressedis by making changes to the calibration via MTU America.Many ...
    • Deutz DPS13DF under voltage shutdown

      Please refer to the attached documents to solve the problem.
    • Voltage fluctuations

      PPS are no longer a distributor for the Kohler Marine and Industrial products within Australia and for any Kohler product technical support we can refer customers or our technicians directly to Ty Martin of Clarke Energy: TyMartin| Service/Technical ...
    • engine shutting down.

      On Genset application not used transistor output plant (TOP) have to be terminated with a 10kOhm resistance to avoid wire break alarms.
    • intermittent shutting down

      PPS are no longer a distributor for the Kohler Marine and Industrial products within Australia and for any Kohler product technical support we can refer customers or our technicians directly to Ty Martin of Clarke Energy: TyMartin| Service/Technical ...