MTU 4000 series T2 valve set procedure
The 4000-03 engine valve set procedure is different from the 4000-01 series engine.The correct procedure in found in the relevant operator manual (QL1) readily available on the Business Portal here - Business Portal/Parts and service/documents/Technical documentation/MTU.
Related Articles
MTU Specifications for Liquid Fuels - (Diesel)
MTU specifications for liquid fuels (Diesel) can be found in the Fluids and Lubricants Specifications manual. Section 5. Liquid Fuels has all of the required information needed when evaluating fuel type and quality for MTU engines. Attached is a ...
Preheater setpoints for MTU Onsite Energy Gensets
If a customer wishes to lower the set point of the jacket heaters on MTU OE gensets, for example to lower the base standby load of the installation, then there will normally be a Limit alarm in the ECU that will trigger if the temperature falls too ...
Generator Set Selection Process
Description The purpose of to this bulletin is to give technical staff a basic understanding on the selection of engine and alternator combination to form a generator set (genset) that is sized to create 37kVA of electric capacity, Prime (3B) rated. ...
MTU oil level monitoring, regulating and replenishment level managment system
MTU offers a mechanical optional system that can provided at new engine supply :- - oil level monitoring only. - oil level monitoring, regulation and replenishment system. This version maybe found on many 4000 and 2000 installations including Marine, ...
What Forms do I need to commission an MTU Onsite Energy generator set?
MTU forms for Commissioning (for all engine types) can be found on the Business Portal by following this menu tree:Parts & Service / Documents / Forms and then click "Forms for Commissioning".For MTU Onsite Energy sets, there is a Cover Sheet and ...