CSA / QGC - 400 gas gensets @ Bellevue & Argyll

CSA / QGC - 400 gas gensets @ Bellevue & Argyll

Checked in with branch, customer has been quoted for 20,000hr service.Likely in 6-8 weeks.
    • Related Articles

    • FW: Bellevue Gas Mixture starting issue.

      Have discussed this with MTU, the best way forward will be to make sure the tune from 0-40% load is richer as per the MTU map around 450 PPM this will give a better response to leaner gas at idle without comprimising the engine and will also be ok in ...
    • S4000L61/62 Gas: Failures of Tecjet and diagnosing

      It has been established that Tec jet components on S4000L61/62 Gas engines have a higher-than-expected failure rate.  Branches supporting these installations should review their Tec jet stock levels and consider approaching customers to replace the ...
    • MTU 4000 Gas Oil life + condition based monitoring

      Please refer to the attached documents regarding the oil life + condition based monitoring
    • Preheater setpoints for MTU Onsite Energy Gensets

      If a customer wishes to lower the set point of the jacket heaters on MTU OE gensets, for example to lower the base standby load of the installation, then there will normally be a Limit alarm in the ECU that will trigger if the temperature falls too ...
    • Overhaul tolerances / clearances for ABB turbo on S4000 Gas engine

      Series 4000 Gas engines are fitted with ABB turbos.  These require cleaning and overhaul as part of QL3 maintenance.The attached document from ABB details the axial and radial clearances that the ABB turbocharger needs.NOTE: this is taken from a ...