Using PDM Copy Tree to copy files into New Project Folder

Using PDM Copy Tree to copy files into New Project Folder

·         When you copy a file from an old project to a new project, the new file (even with new name changes etc.) contains variable values from the old project.

·         Example would be copying a file from the “Bluescope” folder to my “Test Project – Kevin” folder, the new file will still have the ‘Product Family, ‘Product’, ‘Project Number’ and ‘Project Name’ linked to the “Bluescope” values.

·         Furthermore, the created on, created by etc. also has old values. However, these values get overwritten when the file is pushed through the workflow.


The solution:

·         I’ve changed COPYtree so that when copying to a new folder, these variables get cleared. This means the new data card will be mostly blank!

·         To inherit new project values to the data card:

1.       Check out your new files (the newly copied over ones)

2.       Then in the parent folder of your newly copied files, HIGHLIGHT>MODIFY (Top Toolbar)>Update>Values in Files.



3.       A window should pop up with a few prompts. You can select next for all of them until you reach step 4 (Note, the first step allows you to filter which checked out files you want to update).

4.       On Step 4, ensure you highlight yes to all available variables to be ‘updated’.

5.       Once you complete the prompts the files you had checked out in that folder should no longer be blank.



    • Related Articles

    • Creating Transmittals and Major/Minor Projects

      Creating a New Project In PDM, navigate to the off-highway folder: C:\PenskeVault\Engineering\Off Highway. Right click in empty space. In the right-click menu select New> A New Project NEOF. 4. Fill out the template cards that pop up. 5. Go into your ...
    • Generating Document Transmittal information from PDM tool

      The process of obtaining the data card details for the transmittal document was previously difficult and cumbersome . But now, this process can be automated and the details from the data card can be extracted easily. The data card of the document ...
    • Check ethernet IP connections of different modules using Ping Test

      The powerpoint attached can be used to diagnose which module is not communicating on an ethernet network using a Ping test funtion.
    • new engine Run-In initial oil Daimler / OM and MTU LPR

      Daimler manufactered engines ie. OM legacy & MTU LPR models are typically supplied new from factory with oil already providing preservation benefit and is considered suitable as an initial "Run In" oil capable to 1st scheduled service event. Below ...
    • Display Download Project Error - Error MTU.dll

      Display Download Project Error Display DIS10-13 (DIS Firmware: DIS Loader 8.02) An error occurs when the new display downloads the application data from an external BDM server: the download occurs when the display downloads the project data. The DIS ...