Penske Off-Highway Engineering Drawing Guide
When drawings are created and approved for the first time
(Revision A), they should have the following comments to confirm that the
drawings are approved.
·
Part drawing Revision A description:
RELEASED
FOR MANUFACTURE
· Assembly Drawing Revision A description:
RELEASED
FOR REFERENCE ONLY
Below is an example of how a typical Penske off-highway
engineering drawing should look like. Comments are shown in each field and where to
input the information.

A convenient guide for Geometric Dimensioning and Tolerancing (GD&T) symbols can be found in the following website.
Related Articles
Drawing Revision Triangle
After each revision change on a Penske Off-Highway Engineering drawing, a description of the changes required are to be recorded in the revision table. A Design Change Request (DCR) may be required if the change is major. To make the changes easier ...
Penske Off-Highway Engineering - Design Change Request (DCR)
A DCR should be summitted if any changes with the initial scope have changed on the project. If there are major changes to a project compared to the initial submitted RFES, a new RFES form should instead be summited. A DCR should only be submitted ...
Hitachi EX3600 Engine change out guide.
TSD 11-08 REV3 has been developed to assist service technicians to remove and replace a 16V4000E20R engine in a Hitachi EX3600 excavator.
Technicians Guide LPR_HDEP Cylinder Kit Failure
Technicians Guide LPR_HDEP Cylinder Kit Failure
MTU drawing No: 0182504901
MTU Drawing # 0182504901 has a typo error with the labeling of the coupling to flange bolts. Use Geislinger drawing # G001152E which has the correct labeling of all bolts. MTU drawing based on this.