TSD 20-08 additional unit release - increased oil level for Komatsu 830E & 930E repower engines

TSD 20-08 additional unit release - increased oil level for Komatsu 830E & 930E repower engines

G’day Jim,

              Following on your official request of Technical support to review suitability of applying TSD 20-08 to current Komatsu repowering fleets I can confirm comparison of key hardware between our current factory engine supplied with EH5000 and 830E & 930E repower engine supply are identical for below listed items and therefor the optional change to utilising the increased oil level dipstick as per TSD 20-08 is approved by Penske Technical support.

 

Oil pan – X59501400026 (ss from X59501400006)

Dipstick tube assy – 5240100566

Dipstick standard – X52699100807

 

Example engine numbers reviewed:-

EH5000 – 5272013389 / 16v4000C31

830E – 5272013526  / 16v4000C21

930E – 5272013413 / 16v4000C21L

 

Please utilise this email with the attached for your project.

 

Best Regards

Tim Pell   |  National Technical Manager – Industrial Markets.

 

Penske Australia | 181 Viking Drive, Wacol, Qld 4076. Australia

P: +61 7 3271 7791 (direct)  |  M: +61 417 623 556

E: tpell@penske.com.au  |  W: www.penske.com.au

 

 

From: Livermore, Jim <JLivermore@penske.com.au>
Sent: Thursday, 5 May 2022 1:02 PM
To: Pell, Tim <TPell@penske.com.au>; McCowan, Brett <BMcCowan@penske.com.au>; Leeder, Brian <BLeeder@penske.com.au>
Cc: Burton, Dominic <DBurton@penske.com.au>
Subject: Increased oil level for Komatsu 830E / 930E engines

 

Hi Guys,

               I am looking to roll this increased oil level option out across the Yancoal and HVO repowered 830E and 930E truck engines.

I recall Tim doing a review of the sump arrangement of the 16V4000C21 engines we are using in this repower program for me and giving me a verbal ok to make the Dipstick change.

 

However I am not sure if a separate TSD has been provided for that model or a revision of the above has been done to include the 830/930E model trucks?

I am pretty sure that I will need this sort of document to provide the customer to assist in the change management process.

If one has not been done, is it possible to have one written up for this project?   

 

Regards,

Jim Livermore | Business Manager – Mining

 

11 - 13 Garling Road, Kings Park, NSW, 2148

P: +61 2 8822 7015 (direct) | M: +61 407 921 765

E: jlivermore@penske.com.au | W: penske.com.au

 